1. DA sand body
2. Urethane prime the body and panels
3. Prime and paint front clip
4. Reinstall front suspension
5. Install tunnel ram
6. Install Cam
7. Install water pump
8. Install roller rockers
9. Install Headers
10. Install TCI Stall Converter
11. Put the radiator back on and spectre sleeve kit.
12. Install valve covers
13. Bleed Brakes
I know it sounds like alot but this week is my last week of school I have all next week to work on the car all day. So do you guys think I can get it done. Also I need some instruction on how to install the cam, roller rockers, stall converter, and how to bleed the brakes. So if anyone can let me know how to do those things that would be great.
Thanks Guys
1. DA sand body
2. Urethane prime the body and panels
3. Prime and paint front clip
4. Reinstall front suspension
5. Install tunnel ram
6. Install Cam
7. Install water pump
8. Install roller rockers
9. Install Headers
10. Install TCI Stall Converter
11. Put the radiator back on and spectre sleeve kit.
12. Install valve covers
13. Bleed Brakes
I know it sounds like alot but this week is my last week of school I have all next week to work on the car all day. So do you guys think I can get it done. Also I need some instruction on how to install the cam, roller rockers, stall converter, and how to bleed the brakes. So if anyone can let me know how to do those things that would be great.
Thanks Guys