Vintage Mustang Forums banner

221 - 238 of 238 Posts

·
Registered
Joined
·
187 Posts
Discussion Starter #223
Engine and transmission are all installed and aligned. Measurements are taken for the new drive shaft. Shifter is installed and headers going in. Ordered the Lokar throttle cable and carb brakes today. Tomorrow I'm ordering gauges and the rest of my electronics.
 

Attachments

·
Registered
Joined
·
187 Posts
Discussion Starter #230
Wiring is continuing. The Lokar throttle is in. This is a super sweet setup. I'm very happy with it. The Modern Driveline Hydralic clutch is installed. Also very nice. I'll be changing all of the peddle pads to match the Lokar throttle. Pulled out the Mustangs to Fear consoles and door panels to check for fit. This car is going to be sooo sweet. It amazes me how small and low this car is. Parked next to a Toyota Corrola it looks like a toy almost. With 450 hp this thing will fly.
 

Attachments

·
Registered
Joined
·
18 Posts
Lizard Skin is FINISHED! I will also dyna mat my interior as well. The front suspension is now installed the engine bay is blocked and ready for paint. Hopefully I will have color on the car next week. 👏👏

can you have the lizadskin then apply dynamite on top of it
 
221 - 238 of 238 Posts
Top