Vintage Mustang Forums banner
1 - 1 of 18 Posts
Boy, 2014 was A LOT of work! Here's the list with a FIRM March deadline...

2014

1) TCP rack and pinion CHECK
2) Adjustable Coilover shocks CHECK
3) Cobra aluminum valve covers and air cleaner CHECK
4) New gas tank CHECK
5) New chrome trim, bumper, badges and chrome trim for the fold-down seats CHECK
6) Repair leak in rear main seal CHECK
7) Replace headers and paint engine while it was out CHECK
8) Sand, prime and paint car 1/2 CHECK....sanding and priming complete ready for paint
9) Install Holley Terminator EFI, pressure gauge, filters and electric fuel pump CHECK
10) Install 3.70 gears CHECK
11) Replace exhaust pipes and mufflers CHECK
12) Install custom Autometer gauges replacing the stock cluster CHECK

2015

1) Fresh paint
2) TMI Sport R seats and door panels (purchased waiting to be taken to the upholsterer)
3) Wheels (purchased waiting to install after paint)
4) TCP aluminum pedals

I really, really, really hope that's it for 2015! I've addressed about everything I could possibly think of.
 
1 - 1 of 18 Posts